This site is in testing phase. The configurator and other features may not work correctly. If you found an error, please let us know.

Rehabilitation center: 6,000 m³/h VTS ventilation and a Haier multi-zone system

Design, installation, and commissioning of engineering systems for a rehabilitation center: a 6,000 m³/h VTS air-handling unit with a plate heat exchanger and a Haier multi-zone system for heating and cooling with an estimated capacity of 80 kW.

Location: Kyiv Oblast.Category: commercial

Installation photo report

Installation of a compact supply and exhaust unit and insulated air ducts beneath the ceiling.Photo 01
Concealed installation of a supply and exhaust unit and insulated air ducts beneath the ceiling.Photo 02
Concealed installation of a ventilation unit and insulated air ducts beneath the concrete slab.Photo 03
Facade of the rehabilitation center where ventilation and air-conditioning systems were installed.Photo 04
Ceiling of a rehabilitation hall with an integrated ventilation diffuser and suspended exercise-therapy equipment.Photo 05
Technical installation details

Brief execution notes:

For a rehabilitation center in Kyiv Oblast, design, installation, and commissioning of ventilation, heating, and cooling systems were completed. A VTS ventilation unit rated at 6,000 m³/h with a plate heat exchanger was implemented. The heating and cooling system is based on a Haier multi-zone system with an estimated capacity of 80 kW.

  • Project: rehabilitation center.
  • Location: Kyiv Oblast.
  • Ventilation: VTS, 6,000 m3/h.
  • Heat recovery: plate heat exchanger.
  • Heating and cooling: Haier multi-zone system.
  • Estimated multi-zone system capacity: 80 kW.
  • Scope: design, installation, commissioning.