Bratislava Hotel: 9,000 m³/h ROTOR ventilation and conference hall cooling
Design, installation, and commissioning of indoor climate systems for the hotel's conference halls after renovation: 9,000 m³/h supply and exhaust ventilation with a rotary heat exchanger, a chiller-fan coil cooling system, and connection to the existing chiller.
Installation photo report
Technical installation details
Brief execution notes:
For the Bratislava Hotel in Kyiv, design, installation, and commissioning of ventilation and cooling systems for the conference halls after renovation were completed. A 9,000 m³/h supply and exhaust system with a rotary heat exchanger was implemented, as well as a chiller-fan coil cooling system connected to the existing chiller. After installation, air distribution in the rooms was balanced and adjusted.
- Project: Bratislava Hotel, conference halls after renovation.
- Location: Kyiv.
- Ventilation: supply and exhaust, 9,000 m3/h.
- Heat recovery: rotary heat exchanger.
- Cooling: chiller-fan coil system.
- Connection: to existing chiller.
- Scope: design, installation, commissioning.