YUHOMET: hot air and gas extraction system for aluminum casting
Design, installation, and commissioning of a hot air and gas extraction system for aluminum casting production at YUHOMET: a custom Ventall two-stage filtration system, water plus cyclone, designed for high temperatures, with exhaust hoods made of appropriate steel and ductwork leading to the first filtration and cooling stage.
Installation photo report
Technical installation details
Brief execution notes:
For aluminum casting at the YUHOMET facility, design, installation, and commissioning of a hot-air and gas extraction system were completed. A custom Ventall two-stage filtration system was implemented: water filtration and a cyclone system. The entire system was designed and built for operation at high temperatures. Exhaust hoods made of the appropriate steel and ductwork to the first filtration and cooling stage were installed.
- Project: YUHOMET, aluminum casting production.
- Purpose: removal of hot air and gases.
- Filtration: custom Ventall solution.
- Filtration stages: 2, water plus cyclone system.
- Temperature regime: system designed for high temperatures.
- Exhaust hoods: made of appropriate steel.
- Ductwork: to the first filtration and cooling stage.
- Scope: design, installation, commissioning.